Frac Sand Processing Facility, Wisconsin
Project Type: 2.6-Million-Ton-Per-Year Frac Sand Processing Facility
Location: Wisconsin
Capacities: Raw Sand Receiving: 2,000 TPH Raw Sand Reclaim: 600 TPH Storage and Process: 400 TPH Rail Loadout: 1,000 TPH
A design/build team hired Rapat to design and manufacture a conveying system for the largest frac sand processing facility in the U.S. Rapat was selected for this project based on its design/build experience as well as its ability to deliver a large-scale conveying system. Rapat was responsible for the complete engineering and manufacturing of the conveying system, including detailed conveyor design, transfer chutes and structural supports. This project required close coordination with the primary engineering firm and the contractor. Rapat successfully held to an aggressive 10-month time frame for a successful project.