Lime Plant, Missouri
Project Type: Lime Plant
Location: Missouri
Capacities: 400-800 TPH
A lime plant needed a new material handling system to supply quicklime to its new hydrator. Rapat was hired to provide a fixed tripper and new drive components for an existing barge load-out conveyor and to construct a new trussed conveyor with support structure. The client’s existing conveyor was crucial to the plant’s operation, yet there was limited documentation from the original supplier. In the end, Rapat was successful in specifying the project and constructing the new fixed tripper, while keeping the plant’s downtime to a minimum.